Our Work Experience

Detail Road Survey

  • 17km DTM of Sasol Road St Secundars
  • 40km Streets in Malawi
  • 320km EN1 Road – Mozambique
  • 74km Road, Catete – Muxima, Angola
  • 316km Road – Lichinga Marrupa – Mozambique
  • 54km Road – EN1 to Nova Mambone – Mozambique
  • 60km Road – Cabala Gudja – Mozambique
  • 230km Road – Chirundu Lusaka, Livingstone
  • 20km Road P2-5 Pretoria – Cullinan
  • R544 Witbank to Tweefontein 76km
  • R541 Machado to Badplaas 48km
  • R50 Delmas to Leandra 44km
  • Ramakoka Road D1514,Z561,D503 22km
  • Garankuwa View Streets 16km
  • Shoshanguve W Streets  17.5km
  • Gauteng Road – Dayveyton 7.5km
  • N4 – 120 km – Rustenburg to Zeerust, detail road survey
  • Diepdale road – 9km detail road survey.
  • K111 – 5km detail road survey
  • P39/1 – 15km detail road survey
  • K94 – 4.1km detail road survey
  • K111 – 16.5km detail road survey

Rail Stations

  • Pretoria station
  • Belle Ombre station
  • Bosman Station
  • Barracks station
  • Pretoria West station
  • Atteridgeville station
  • Saulsville station
  • Denneboom station
  • Wonderboom station
  • Kopanong Station
  • Soshanguve Station
  • Roodepoort Station
  • Germiston Station
  • Vereeniging Station
  • Leralla Station
  • Park Station

DTM

  • DTM of the Civic Centre in Phokeng – Rustenburg
  • 140Ha DTM in Makonde – Venda
  • Griffith Intersections – JHB International
  • Railway Stations – Centurion, Hercules, Winternest
  • 30Ha DTM Kayalami Estate
  • 30Ha DTM Southern Gateway – Pietersburg
  • 140Ha Spitskop Mine – Steelpoort
  • 40 Ha Ga – Sekororo – Hoedspruit
  • 86Ha Zuikerbosh – Rand Water – Vereeniging
  • Survey of Egoli Gas
  • Sasol Nitro – Rustenburg
  • Dunottar Site 340Ha
  • 135 Ha Noordgesig
  • Wattle Springs Gun Club 270Ha
  • 20Ha Cheetah Plains Private Game Lodge

Construction Surveys

  • Staking of batters and profiles +/- 20km Road B47 East – Lesotho
  • Staking out of houses – Eagle Canyon From end 2004
  • Brits Hospital 10 months – Brits
  • Bosmanspoort Mine 11months  – Middelburg
  • ATC Collery 1 year – Witbank
  • Madupi Power Station – Construction survey of plant
  • Kusile PowerStation – Construction survey of plant
  • Kwagga North Mine Conveyor 6km
  • Nampak
  • Bethesda Church construction survey

Staking / Setting Out

  • Staking of Road 1410 – Krugersdorp
  • Road R50 – Delmas to Leandra 44km
  • Conveyor line 7km Spitskop Mine Steelpoort
  • Conveyor line 2km Tweefontein Mine
  • Conveyor line 28km – Secunda to Impumelelo

Pipeline Surveys

  • Survey of existing pipe lines – 3 villages in Botswana
  • From end 2004
  • Dekema Sewer line 8.5Km – Wadeville Germiston
  • Waterline Pretoria 5km
  • Weswits – Stormwater, Sewer and water pipelines asbuilds

Enviromental Surveys

  • Survey of old mine for rehabilitation
  • From end 2004
  • Diamond Mine 120Ha – Douglas
  • Alfa Mine 50Ha – Vryheid
  • Richter Sand rehabilitation 20ha
  • Monitoring Wells – Gauteng

Pipeline Surveys

  • Survey of existing pipe lines – 3 villages in Botswana
  • From end 2004
  • Dekema Sewer line 8.5Km – Wadeville Germiston
  • Waterline Pretoria 5km
  • Weswits – Stormwater, Sewer and water pipelines asbuilds

Cadastral Survey

  • 1000 Stands in Moloto Township
  • +/- 800 Stands in Eagle Canyon Golf Estate – Krugersdorp From end 2004
  • 435 Erven in Korro Kreek – Nylstroom
  • 170 Sectional Titles in Protea Glen

Volume Survey

  • 44Ha Area Mandini Sappi (Stocktake) – Tugela
  • 73Ha Area Ngodwanna Sappi – Nelspruit
  • Pullens Hope mine earthworks – Optimum coal
  • Leandra Quarry
  • West end Clay Quarry

Mine Survey

  • Kwagga North – Construction of 6km conveyor line, Preliminary design and construction survey : Optimum Coal
  • Spitskop Mine – Construction survey of Plant (300Ha), conveyor 7km and tip
  • Mareesburg Mine – Survey Access Roads of 10km and stockpile yard of 280Ha