Skip to content
Detail Road Survey
- 17km DTM of Sasol Road St Secundars
- 40km Streets in Malawi
- 320km EN1 Road – Mozambique
- 74km Road, Catete – Muxima, Angola
- 316km Road – Lichinga Marrupa – Mozambique
- 54km Road – EN1 to Nova Mambone – Mozambique
- 60km Road – Cabala Gudja – Mozambique
- 230km Road – Chirundu Lusaka, Livingstone
- 20km Road P2-5 Pretoria – Cullinan
- R544 Witbank to Tweefontein 76km
- R541 Machado to Badplaas 48km
- R50 Delmas to Leandra 44km
- Ramakoka Road D1514,Z561,D503 22km
- Garankuwa View Streets 16km
- Shoshanguve W Streets 17.5km
- Gauteng Road – Dayveyton 7.5km
- N4 – 120 km – Rustenburg to Zeerust, detail road survey
- Diepdale road – 9km detail road survey.
- K111 – 5km detail road survey
- P39/1 – 15km detail road survey
- K94 – 4.1km detail road survey
- K111 – 16.5km detail road survey
Rail Stations
- Pretoria station
- Belle Ombre station
- Bosman Station
- Barracks station
- Pretoria West station
- Atteridgeville station
- Saulsville station
- Denneboom station
- Wonderboom station
- Kopanong Station
- Soshanguve Station
- Roodepoort Station
- Germiston Station
- Vereeniging Station
- Leralla Station
- Park Station
DTM
- DTM of the Civic Centre in Phokeng – Rustenburg
- 140Ha DTM in Makonde – Venda
- Griffith Intersections – JHB International
- Railway Stations – Centurion, Hercules, Winternest
- 30Ha DTM Kayalami Estate
- 30Ha DTM Southern Gateway – Pietersburg
- 140Ha Spitskop Mine – Steelpoort
- 40 Ha Ga – Sekororo – Hoedspruit
- 86Ha Zuikerbosh – Rand Water – Vereeniging
- Survey of Egoli Gas
- Sasol Nitro – Rustenburg
- Dunottar Site 340Ha
- 135 Ha Noordgesig
- Wattle Springs Gun Club 270Ha
- 20Ha Cheetah Plains Private Game Lodge
Construction Surveys
- Staking of batters and profiles +/- 20km Road B47 East – Lesotho
- Staking out of houses – Eagle Canyon From end 2004
- Brits Hospital 10 months – Brits
- Bosmanspoort Mine 11months – Middelburg
- ATC Collery 1 year – Witbank
- Madupi Power Station – Construction survey of plant
- Kusile PowerStation – Construction survey of plant
- Kwagga North Mine Conveyor 6km
- Nampak
- Bethesda Church construction survey
Staking / Setting Out
- Staking of Road 1410 – Krugersdorp
- Road R50 – Delmas to Leandra 44km
- Conveyor line 7km Spitskop Mine Steelpoort
- Conveyor line 2km Tweefontein Mine
- Conveyor line 28km – Secunda to Impumelelo
Pipeline Surveys
- Survey of existing pipe lines – 3 villages in Botswana
- From end 2004
- Dekema Sewer line 8.5Km – Wadeville Germiston
- Waterline Pretoria 5km
- Weswits – Stormwater, Sewer and water pipelines asbuilds
Enviromental Surveys
- Survey of old mine for rehabilitation
- From end 2004
- Diamond Mine 120Ha – Douglas
- Alfa Mine 50Ha – Vryheid
- Richter Sand rehabilitation 20ha
- Monitoring Wells – Gauteng
Pipeline Surveys
- Survey of existing pipe lines – 3 villages in Botswana
- From end 2004
- Dekema Sewer line 8.5Km – Wadeville Germiston
- Waterline Pretoria 5km
- Weswits – Stormwater, Sewer and water pipelines asbuilds
Cadastral Survey
- 1000 Stands in Moloto Township
- +/- 800 Stands in Eagle Canyon Golf Estate – Krugersdorp From end 2004
- 435 Erven in Korro Kreek – Nylstroom
- 170 Sectional Titles in Protea Glen
Volume Survey
- 44Ha Area Mandini Sappi (Stocktake) – Tugela
- 73Ha Area Ngodwanna Sappi – Nelspruit
- Pullens Hope mine earthworks – Optimum coal
- Leandra Quarry
- West end Clay Quarry
Mine Survey
- Kwagga North – Construction of 6km conveyor line, Preliminary design and construction survey : Optimum Coal
- Spitskop Mine – Construction survey of Plant (300Ha), conveyor 7km and tip
- Mareesburg Mine – Survey Access Roads of 10km and stockpile yard of 280Ha